10000 S./Highland Dr. Construction Notice
November 29, 2023
Commencing December 4, 2023 BD Bush Excavation will begin with the install of our new transmission line along the Highland Dr corridor. This new line will help provide redundancy throughout the system and assist us in providing service in case of a failure to existing infrastructure. Access to the Highland Dr. corridor will be limited or unavailable from 9800 S to 10000 S. while construction is occuring.